11/14/2022 0 Comments Eros quick donning mask manual![]() ![]() Many "experts" are involved in writing the MPD looking at failure modes, whether the failure would be evident, impact of the failure, etc., then decide on what inspections / tests should be carried out and how often to ensure continued serviceability of the system. ![]() The AMP is derived from the Maintenance Planning Document published by the aircraft manufacturer and approved by the NAA in the country of manufacture. In my experience, for boxed quick-don masks, pre-flight test is to hit the test button and ensure the flow indicator shows oxygen flow.Ī general visual inspection of the removed mask and inflatable harness, operation of the quick don harness, operation of mask mic and cleaning of the mask and stowage is carried out on scheduled maintenance at a period specified in the Aircraft Maintenance Program. ![]() What does your Chief Pilot / Flight Technical Manager say on the subject? What does it tell you to do in your Ops Manual or equivalent? ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |